FREQUENTLY ASKED QUESTIONS (FAQ)

Who needs an Environmental Clearance?

Any new or expansion projects listed in the EIA – Notification 2006 and its amendments thereof require Environmental Clearance from Ministry of Environment, Forest and Climate Change (MOEF&CC).

Click Here

What is the difference between Category A and Category B projects?

The projects are divided into 2 categories based on their threshold capacities as specified in EIA-Notification 2006 and its amendments thereof. Category ‘A’ projects will be appraised at the Central level while Category ‘B’ projects at the State level.

Click Here

What are the stages in the process of an EC?

At what stage of the project do you need to contact us to obtain an EC?

Environmental Clearance needs to be obtained before the commencement of construction of the project. It is advised to approach us apply for an EC at least 12 months in advance.

Click Here

What is the monitoring mechanism for ensuring compliance with environment clearance conditions?

Project Proponent is required to submit a half yearly compliance report, twice in a year i.e. 1st June and 1st December, to MoEF/SEIAA and Regional offices of MoEF in soft copies for monitoring of the project both during construction and operation phases.

Click Here

When can you obtain Consent to Establish (CTE)/ Consent for Establishment (CFE)?

The CTE/ CFE can be obtained from SPCB after receiving the Environmental Clearance for the project.

Click Here

When can you obtain Consent to Operate (CTO)/ Consent for Operation (CFO)?

1st time CTO/ CFO shall be applied 3 months prior to commissioning of the plant.

Click Here

What makes Pioneer Enviro different from the rest? Why choose us?

The Pioneer Advantage:

  • One stop solution for all your EIA needs
  • Successfully obtained Environmental Clearance (EC) for 750+ projects
  • 100% client satisfaction
  • Comprehensive guidance to the clients at every stage of the EC process right from site selection till grant of EC.
  • Highly qualified and experienced team of environmental professionals
  • Excellent success rate in EAC (Expert Appraisal Committee) / SEAC (State Expert Appraisal Committee) presentations in first presentation itself
  • Follow-up with the respective government authorities
  • Strict adherence to time schedule
  • Quality report preparation strictly in concurrence with requirements of EAC/SEAC.
  • Staying up to date and being aware of the latest statutory norms

Click Here

What is the benefit of hiring us?

We at Pioneer Enviro deliver peace of mind to our clients.

We give them proper guidance on when to do what and support them at every stage of the EC process and also follow-up with the respective government authorities to ensure the project moves forward smoothly as per schedule. We focus on providing quality and timely services to our clients which ensures 100% satisfaction, 100% of the time.

Click Here

Which sectors does Pioneer Enviro specialize in?

Pioneer Enviro is accredited by NABET to prepare EIA/ EMP reports for the following sectors:

  • Metallurgical industries
  • Thermal power plants
  • Coal washeries
  • Mining of minerals
  • Building and Construction project
  • Townships and. Area development projects
  • Distilleries
  • River valley projects
  • Mineral beneficiation
  • Cement plants
  • Asbestos milling and asbestos based products
  • Sugar industry

Click Here